Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online more than two weeks ago
Candidate
Male, 27 years, born on 11 September 1997
Not looking for a job
Uralsk, willing to relocate (Almaty, Astana, Baku, Kazakhstan, Russia), prepared for business trips
The approximate area of the job search is specified
Project material engineer
Specializations:
- Production engineer, quantity surveyor
- Quality engineer
- Field engineer
- Power engineer, electrical engineer
Employment: full time, project work
Work schedule: full day, rotation based work
Work experience 7 years 2 months
March 2024 — currently
1 year 1 month
LLP ElectroStroiMontazh
Atyrau
Material and Technical Support Engineer.Preservation Coordinator
1) Prepare internal requisition for receiving materials from clients.
2) Work with documentation, create Matrix for databases,
3) Receiving-transferring materials and preparing materials for installation and incoming inspection.
4) Maintain a single base list of materials received and those materials in the process of collection.
Managing the preservation team in charge of the execution of preservation work.
Training and verification of competency of preservation crew working on preservation activities.
Controlling the Preservation schedule using CTR’s and Project approved practices, procedures and database.
Ensuring Preservation during storage at different locations (Construction Yard, Holding Stations and 3GP.3GI site)
Identifying Preservation activities for identified/tagged equipment.
Liaising with QA/QC Manager for planning/reporting of all equipment Inspections.
Applying initial Preservation where not applied or where the Preservation is removed for construction or installation purposes as per preservation dossiers and vendor recommendation.
Ensuring Initial Preservation of bulk materials, including piping, valves and complete piping systems according to the applicable specifications.
Determining and maintaining the stock of preservation consumables required.
Work with 12 Week Lookahead planning and control work process.
May 2021 — November 2022
1 year 7 months
LLP Velesstroy
Atyrau
Materials Coordinator in the E&I Department
Organize timely pickup and delivery of materials to job sites in conjunction with warehouse workers and contractors.
Working with the planning department to update and calculate RSD (estimated time of delivery) (ETA) and TNM ("required on site") (RAS) dates for material.
Checking stock availability of required materials for specific work packages to prevent unforeseen downtime.
Generating Bills of Materials and Requisitions for Release of Goods (BOMs) for contractors to ensure uninterrupted supply and to control the correct release of materials for the scope of work. Drawing up requests for release of materials not included in the specification in conjunction with the engineering department.
Maintaining an operational relationship with contractors to keep them informed in the progress of their work under the contract.
Making necessary reports on materials issued.
Coordinating individual items of equipment with warehouse personnel to ensure storage conditions are met.
Jointly monitoring with purchasing and logistics departments the movement of materials to job sites and notifying all concerned.
Reviewing and finalizing contractor summary specifications and coordinating material transfers.
Expedited processing of critical deliveries in the face of material shortages or extreme material requirements.
Full responsibility for a defined scope of work and tasks including metal fabrication processing, material data sheet, electrical equipment, etc.
Analyze problems, find and propose solutions to complex logistics issues.
Enter data into the MatMan system reflecting information on material packing slips.
Entering material receipt information into the database to generate material receipt reports as well as excess, shortage, and spoilage reports.
Process requisitions for ordering materials.
Updating and replenishment of the inventory list.
Ability to use the ProArc database to print purchase order information.
Preparation of reports using MatMan database.
Coordination of transportation for delivery of project materials and consumables.
August 2020 — March 2021
8 months
ТОО ASDANER
Astana
Construction, Real Estate, Architecture... Show more
Preservation coordinator
Managing the preservation team in charge of the execution of preservation work.
Training and verification of competency of preservation crew working on preservation activities.
Controlling the Preservation schedule using CTR’s and Project approved practices, procedures and database.
Ensuring Preservation during storage at different locations (Construction Yard, Holding Stations and 3GP. 3GI site)
Identifying Preservation activities for identified/tagged equipment.
Liaising with QA/QC Manager for planning/reporting of all equipment Inspections.
Applying initial Preservation where not applied or where the Preservation is removed for construction or installation purposes as per preservation dossiers and vendor recommendation.
Ensuring Initial Preservation of bulk materials, including piping, valves and complete piping systems according to the applicable specifications.
Determining and maintaining the stock of preservation consumables required.
Work with 12 Week Lookahead planning and control work process.
September 2019 — March 2020
7 months
ТОО"Compass Service"
Atyrau
Construction, Real Estate, Architecture... Show more
Material and Technical Support Engineer
1) Prepare internal requisition for receiving materials from clients.
2) Work with documentation, create Matrix for databases,
3) Receiving-transferring materials and preparing materials for installation and incoming inspection.
4) Maintain a single base list of materials received and those materials in the process of collection.
June 2016 — August 2019
3 years 3 months
Fart Oil LLP
Uralsk
Construction, Real Estate, Architecture... Show more
Preservation coordinator
Managing the preservation team in charge of the execution of preservation work.
Training and verification of competency of preservation crew working on preservation activities.
Controlling the Preservation schedule using CTR’s and Project approved practices, procedures and database.
Ensuring Preservation during storage at different locations (Construction Yard, Holding Stations and site)
Identifying Preservation activities for identified/tagged equipment.
Liaising with QA/QC Manager for planning/reporting of all equipment Inspections.
Applying initial Preservation where not applied or where the Preservation is removed for construction or installation purposes as per preservation dossiers and vendor recommendation.
Ensuring Initial Preservation of bulk materials, including piping, valves and complete piping systems according to the applicable specifications.
Determining and maintaining the stock of preservation consumables required.
Work with 12 Week Lookahead planning and control work process.
January 2018 — October 2018
10 months
Eurostroy LLP
Atyrau
Construction, Real Estate, Architecture... Show more
Preservation coordinator
Managing the preservation team in charge of the execution of preservation work.
Training and verification of competency of preservation crew working on preservation activities.
Controlling the Preservation schedule using CTR’s and Project approved practices, procedures and database.
Ensuring Preservation during storage at different locations (Construction Yard, Holding Stations and site)
Identifying Preservation activities for identified/tagged equipment.
Liaising with QA/QC Manager for planning/reporting of all equipment Inspections.
Applying initial Preservation where not applied or where the Preservation is removed for construction or installation purposes as per preservation dossiers and vendor recommendation.
Ensuring Initial Preservation of bulk materials, including piping, valves and complete piping systems according to the applicable specifications.
Determining and maintaining the stock of preservation consumables required.
Work with 12 Week Lookahead planning and control work process.
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category BAbout me
In addition to the above specialties, there is experience in logistics, ventilation products manufacturing. Ordering design materials from TSOs to create FMR.BOM-FMR.FMRR.Cabel pulling tracker.Punches Master. MWAP.Package ticket.Calibration of instruments.
Additional courses:
Certificate Respiratory Protective Equipment (TCO)
Certificate Insulation Hazardous Energy
Certificate Safe Excavation Practices
Certificate Lifting Operations
Certificate Confined Space Entry
Certificate Working at Heights
Certificate First Aid for Affected
Driving license category B,
Higher education (bachelor)
2020
West-Kazakhstan Engineering and Technological University
Engineering Science and Technology, Oil and gas drilling
Languages
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan, Russia
Desired travel time to work: Doesn't matter